![]() POWER SYSTEMS |
POWER SYSTEMS |
|
|||||
| BLOG
EEE
< PREVIOUS EEE
NEXT > IEA Electricity 2024 ENTSO-E`s views on Offshore Development 2023 ESIG Fall Tech Workshop MIT EESG Seminar Series Spring 2023 Could nuclear fusion energy power the future? Baihetan Hydropower Station The World`s Top 10 Nuclear Power Plants by Capacity
< PREVIOUS EEEEEE
NEXT >
Showing 36 to 42 from 167 blogs In order to extend the content of this website, we invite you to contribute any information, including news, events, books, blog posts, universities, links, etc., you find helpful about power system engineering.
POWER SYSTEMS
|
- Baihetan Hydropower Station All 16 power generation units of world`s largest and most sophisticated hydropower project -- Baihetan Hydropower Station have been put into operation on December 20, 2022. Baihetan hydropower project development details The feasibility study for the project was approved by the National Development and Reform Commission of China in 2010. Construction works on the project were started in August 2017 and the first turbine unit was installed in January 2019. Baihetan is one of the world`s first projects to use 1GW hydro-turbine generator units. Baihetan hydroelectric facility make-up The Baihetan project involved the construction of a concrete double-curvature arch dam with a crest elevation of 834m and a crest width of 13m. The project comprises two underground powerhouses, one each on the left and right banks of the dam. Each powerhouse will be equipped with eight 1,000MW Francis turbines being indigenously manufactured in China. Baihetan dam and reservoir details The impoundment level of the dam is 825m, while the reservoir capacity is 20.627 billion cubic metres (bcm). The dam is designed to have a regulation storage capacity of 10.43bcm and flood control storage capacity of 7.5bcm. The Baihetan dam has six flood gate structures and three spillway tunnels. The flood discharge capacity of the project is 42,346m³/s. |