EE power systems


BACK TO NEWS



Sep 19, 2016 - NordLink: The green link


NordLink – „the green link“– is the first direct connection between power markets in Norway and Germany. The 623-kilometre-long interconnector has a capacity of 1,400 megawatts (± 525 Kilovolt) and will make it possible to exchange renewable energies: hydropower from Norway and wind energy from Germany. At the same time, NordLink plays a part in ensuring reliable supply in both countries, furthermore it will help reduce CO2 emissions and reach climate goals. Due to the distance involved and its high transmission capacity, NordLink will be realised as HVDC transmission.



Similar news:

Oct 1, 2021 Sharing renewable energy between UK and Norway


The world`s longest subsea electricity interconnector, North Sea Link,

Jul 2, 2015 COBRAcable - from concept to connection


In collaboration with the Dutch TSO TenneT, Energinet.dk is establishi






Clicky