elektroenergetika
POWER SYSTEMS

NEWS

EVENTS
BOOKS

BLOG
UNIVERSITIES

NIKOLA TESLA
LINKS

CONTACT
elektroenergetika POWER

SYSTEMS
Trending Now: Solar, Wind, Grid

Aug 24, 2024 - 3 x 500kV Drone Stringing at Site C with Infravision and BC Hydro



The Site C hydroelectric project in British Columbia, Canada, is a landmark clean energy initiative, valued at over $10 billion, designed to power millions of homes with hydroelectric power. Infravision was tasked with connecting the critical 3 x 500kV transmission lines that channel power from the Peace River dam to the grid. Utilizing cutting-edge drone technology, Infravision integrated with BC Hydro line crews to deliver a low-impact, safe, and highly efficient stringing solution that significantly minimized the site`s exclusion zone and environmental footprint.
Similar news:

Aug 8, 2018 Underground vs Overhead Transmission Lines


A look at the difference between underground and overhead transmission

Aug 9, 2017 Drone Stringing Transmission Lines


Line stringing some of the largest transmission lines in The United St




elektroenergetika
POWER SYSTEMS

Clicky

Clicky