elektroenergetika
POWER SYSTEMS

NEWS

EVENTS
BOOKS

BLOG
UNIVERSITIES

NIKOLA TESLA
LINKS

CONTACT
elektroenergetika POWER

SYSTEMS
NEWS EEE EEE NEXT >

Oct 4, 2026 - How China`s Next Five Years Will Transform Global Energy Generation

Oct 2, 2026 - A powerful buffer: How solar saved the EU

Oct 2, 2026 - China Connects First 100-MW Compressed Carbon Dioxide Energy Storage Project

Oct 2, 2026 - France`s largest battery energy storage site has been inaugurated

Oct 1, 2026 - There are newer even more exciting battery technology just around the horizon

Oct 1, 2026 - China`s First Million-kilowatt Photovoltaic-Solar Thermal Power Project Connects to Grid in Qinghai

Oct 1, 2026 - Main Complex for China`s "Artificial Sun" Project Completed in Hefei

Trending Now: Solar, Wind, Grid

Aug 24, 2024 - 3 x 500kV Drone Stringing at Site C with Infravision and BC Hydro



The Site C hydroelectric project in British Columbia, Canada, is a landmark clean energy initiative, valued at over $10 billion, designed to power millions of homes with hydroelectric power. Infravision was tasked with connecting the critical 3 x 500kV transmission lines that channel power from the Peace River dam to the grid. Utilizing cutting-edge drone technology, Infravision integrated with BC Hydro line crews to deliver a low-impact, safe, and highly efficient stringing solution that significantly minimized the site`s exclusion zone and environmental footprint.
Similar news:

Sep 24, 2019 How do Electric Transmission Lines Work?
Discussing some of the fascinating engineering that goes into overhead electri

Aug 8, 2018 Underground vs Overhead Transmission Lines


A look at the difference between underground and overhead transmission

May 21, 2018 "Skywalking" On The ±1100KV Ultra-high Voltage Live-line in China


Chinese electricians have succeeded on Saturday in simulating 1100kv l

elektroenergetika
POWER SYSTEMS

Clicky

Clicky